The process after the cassava flour machine arrives at the factory
The process after the cassava flour machine arrives at the factory can be divided into four sections: the installation of equipment, the welding of the pipe network, the water test, and the trial run. Next, we will introduce the whole process in detail.
The first process after the cassava flour machine arrives at the factory is the installation of equipment. This process requires the full involvement of an engineer to start laying out the equipment according to the layout, electrical diagram and pipe network diagram, which needs to be done in strict accordance with the drawings to exclude problems during the installation process that could lead to damage to the machine.
Then the next process after the cassava flour machine arrives at the factory is the welding of the pipe network. It is also a top priority in the installation process, which will take one to two months to finish depending on the output and the amount of equipment.
After the machine arrives at the factory, it is necessary to carry out a water test of equipment. In addition to part of the equipment needs to have water to run, the majority of the reason for the water test is to check whether the welding joints are firmly welded. If there is a leak, the welding joints need to be patched.
The
last process after the cassava flour machine arrives at the factory is
the trial run of equipment. There are totally three times material
tests. The first material test was conducted along with the water test,
with the goal to complete the flow from cassava to cassava flour and to
find out if there are any specific corrections in the process. After the
rectification, the second material test was carried out to check
whether the machine achieves the designed output. The third material
test is made hit the quality requirements. Since then the whole line has
reached the standard of production and is ready for official
production.
This is the whole process after the cassava flour machine arrives at the factory. If you wanna set up a cassava flour processing factory, welcome to contact us. Project managers will offer you the best solution design!
http://www.cassavaprocessing.com
WhatsApp/Phone:+86 135 2661 5783
Email:market@doinggroup.com
Comments
Post a Comment
Hi,write down you message,and let's talk according the difference.